Thursday, January 22, 2015

CHECK LIST FOR ISOMETRIC

1)       Line Nos.


2)       Line Specs 

3)       Start Point Location

4)       End Point Location

5)       Branch Connection

6)       Valve Accessibility

7)       Support

8)       Insulation (For Insulated Line Only)

9)       Instrument Connection

10)   Flow Arrow

11)   High Point Vent, Low Point Drain

12)   Hydro Test Vent And Drain

13)   Nozzle Connection

14)   Nozzle Nos.

15)   Equipment Nos.

16)   Coordinates And Elevations

17)   Iso North

18)   Bill Of Material

19)   Valve Tag Nos.

20)   Instruments Tag Nos.

21)   Continuation Sheets Or Iso. Nos.

22)   Grid Location And Nos.
 
 

No comments:

Post a Comment